16 Temmuz 2011 Cumartesi

Illustration :: Architectural

done for the company

7 Temmuz 2011 Perşembe

OFFICE WORK: 二つ の コア / double core

この ビル は 二つ の コア が あります。 階段 の二つで 階上 に 上る 事 ができます。 シャフト も2度に 増えて きました。 一階 では デパート があります。 デパート は 地下二階 で 大きくなります。斜面 があるから いろいろな 玄関 のデザイン をしました。
Double core building with two stairs, and two times as much shafts. 6 Apartments on a long&narrow floor has led me to this solution. On the first floor there is a shopping center designed together with its basement.



The building is to be constructed on a slope, so there are varying entrances to the building: Residential entrace, Shopping Center Main Entrance, Employee's Entrance, Back Exit, etc.







  There is a previously built building allocated at the neighbour parcel. The landlord has decided to connect both his buildings with a tunnel system, interposing them into a big shopping center & showcase center. In order to achieve this, I have taken the previously designed building's basement levels as the starting point. So that both buildings' levels match each other.





The neighbour building is drawn back from the road about 3 mt. To provide integrity, my building was also retreated 3 meters. So that both buildings form a clear line of direction.


PLANS, SECTIONS, FACADES ARE AS BELOW:

Double core is visible at the ground floor plan.









How to Design a More Energy Efficient Building with a Contractor

It's always a tough process to persuade a contractor to build an energy efficient building. Contractors often tend to neglect architectural concerns about nature and built environment. Energy efficient housing is quite scary for them because of the pre-manufacturing expenses. Their conventional way of thinking is hard to manipulate, however, it's not impossible.

Before you design an energy efficient house, you analyse the site area to get more information about building orientation and microclimate. Because there is a road on the northern side, the contractor has forced me to locate the kitchen and the living room on the north facade. However, by inner windows and high windows on the north side, I was able to reduce the negative effect of this choice.



I have allocated most of the solar shaders on the south facade to reduce ventilation costs during summer. High windows on the north and high windows within the rooms provide ventilation inside the apartments. Also there are wind shafts to suck in air to provide ventilation and air movement.


On the south-west side of the site area, I recommended a pond and trees (which pour out their leaves during winter).






As an ecologically-concerned architect I sometimes feel stuck in between my ideals and my colleagues' financial concerns. This is how I make a building less energy consuming With a few modifications.


SITE PLAN

ground floor plan

normal floor plan: The shafts suck in air to provide air movement inside the house. High windows inside the rooms help cross-ventilation.



the facades: South facade is most occupied by solar shaders. They are easy-to-install mount-on shaders moving on a rail. Their position can be adjusted depending on whether the user wants the sunlight in or not. Mount-on shaders are not a big deal for the contractor because they are less expensive than designing a ''shader coat'' for the building.

section

3 Temmuz 2011 Pazar

Competition :: EXPO




Our expo design for the Prosteel Competition held in Turkey, 2008

Warning: Sketching only!


Can you put up an architectural idea with sketches only? Well I tried and the result is not that bad! This one is one of my undergraduate projects. At the end of the year, our project instructor chose a few of the projects and held an exhibition. My project was included too, but he chose to put up my sketches only!

Here is a lighting devices museum in Galata, from my sketchbook.



stadium

school project



OFFICE WORK: multiple functions / 多情な ファンクション



このレジデン は 多情な ファンクション があります。 一階 は スーパー です。 二階 では 四つ のアパートが あらみあす。3階は
六 の に別れて います。 シャフト の 置きる が 難しくなったりしまいます。それでも、換気 の シャフトは上手 に 置きた。アパートにはお 風呂 だけ は 日差し がありません。 残って はよくあります。

Here is a multiple-use building. On the ground floor there is a midi-size supermarket. The first floor accomodates 4 apartments. The second floor, on the other hand is designed together with the attic to serve 6 duplex houses. Therefore placing the ventilation shafts were quite strategic. Only the bathroom and wc's lack in sunlight, the rest of the rooms are pushed to the facades to receive sufficient daylight.

designed in: 2011 construction started in 2011, kocaeli, turkey



site plan

ground floor plan

first floor plan

second floor plan

roof area

facade, supermarket café

facade, supermarket entrance

facade, building entrance

facade, back

section

section

OFFICE WORK: 本社 のビル / head office building






この本社 ビル GUNEYSER  建築 会社 のために デザインをしました.

This head office building was designed for a construction company, Guneyser Construction.

直立回廊   サラリーマン 仕事中見える 立てられました.

The vertical gallery allows the office workers to be seen whilst  working.

1階 では 利用 美術館  改めました.
直立 回廊   数段  着け 直立 ‘’assemblage’’   よく 見える こともできる.

Ground floor can alternatively be used as an art gallery, so that the vertical – spreading assemblages can be installed outstreching all floors.

階段 エレベーター コア  成す ためで 中央 きてきました.

The elevator and stairs are placed at the center to form a core. Offices face the front, whereas wet volumes are placed on the back side.

ファサードでは ルーバー アルミサッシ   のおってきました.
パッシブソーラー   システム ルーバー 利用して  換気  の 値段  引下げる
On the facade, louvers and aluminum facade panels are used. Louvers are part of the passive solar system. They are placed for benefit from solar distribution: they reduce excessive summer sun and lower down cooling & ventilation expenses.

ground floor plan

1st floor plan

2nd floor plan
roof area

OFFICE WORK: Conceptual Project: Kartepe Town Planning & Municipality Building





This municipality building for Kartepe, Kocaeli has been designed as a replacement of the older one. The existing building fails at being sufficient enough for the increasing worker population. The most critical points of this conceptual project are the entrances and the security areas. Two entrances correspond each other to that the building becomes a passage at the heart of the recreational spaces. Securitiy areas are also designed for the safety of the president and his counsellors.


The site area is adjacent to the main vehicle road that connects Kocaeli to neighbour cities.
Beforehand, a town planning was also suggested by us in order to place the existing road down to a lower level. This will enable us to design a recreational town space upon it and provide safety. Kartepe is aimed to be biggest ski-center of surrounding districts, yet it's a newly growing block of the city. The town planning also asserts restraining industrial blocks and suggesting new residential areas for the upcoming constructions. The strategic placement of the housing blocks near the avenue will let the tourists interact with the local population.

この自治体 の ビル が 前のビルのかわり に 立てる積もりです。 前のビル は従業員 の人口 なら十分じゃないからです。土地は 過密 の通りの近接 に 置きました。 玄関がビルの両方ともに 置きました。 垂直 な ギャラもビルの間であります。 廊下 の幅 は 大勢 の人々 のように ふえてきました。大統領 の 部屋 は安全 な ところ で
デザインしました。 守衛 についている ところも大勢です。

その上、ビルの周り の 都市計画 もしました。 住宅街の前の
土地 より 新しい 計画 を申し入れました。 前のところは 散らか して随分 違うからです。 新しい住宅街は 通りの近くで あります。 この丁目 はスキー場 があって ツーリスト ならいいです。 それから 工業 地方 が減たほうがいいです。 この通りが丁目の中であって、 ツーリスト 周りの ビル で 買い物をして、 料理 尾食べて丁目の人口に 稼ぎ取るようにしています。